Sadbhav Engineering has been declared the successful bidder in respect of the bid invited by National Highways Authority of India (NHAI), Ministry of Road Transport and Highways G-5&6, Sector-10, Dwarka New Delhi-110075 for 4- Laning of Rohtak to Hissar Section of NH-10 from Km 87.000 to km 170.000 including connecting link from km 87.000 (NH-10) to km 348.000 (NH-71) to be executed as BOT (Toll) project on DBFOT pattern under NHDP Phase III in the state of Haryana (Length 98.810 Km).
Get Free MCX Tips, Stock Tips, Forex Tips & NCDEX Tips,Commodity Tips, Share Tips, commodity tips free trial, nifty free tips, commodity trading tips, shares tips, Share Market Tips, Stock Market Tips, free stock tips on mobile, Stock trading tips, Intraday Tips.
or login http://www.epicresearch.co/
No comments:
Post a Comment